Evoca
Brief: We were approached by Evoca to design new ground and first floor offices, training room, toilets and its own branded coffee shop. It was important to ensure a smooth transition from their existing building into this brand-new build. Part of this consultation was designing a functional layout for their extensive Pallett Racking System.
![](https://trucontracts.co.uk/wp-content/uploads/2023/05/E2-1024x768.jpg)
![](https://trucontracts.co.uk/wp-content/uploads/2023/05/E6-1024x768.jpg)
It was paramount that the fitout met all the different departments’ processes and priorities. This meant consulting with engineers and various staff members to ensure this happened.
![](https://trucontracts.co.uk/wp-content/uploads/2023/05/E-3-1024x768.jpg)
![](https://trucontracts.co.uk/wp-content/uploads/2023/05/E8-1024x768.jpg)
What we did: We designed from concept to completion the whole project including the coffee shop/showroom. It was important that Evoca’s brand identity was conveyed in the design.
![](https://trucontracts.co.uk/wp-content/uploads/2023/05/7873e1b7-0f33-42e9-a8b4-4abcb1aec2c8.jpg)
![](https://trucontracts.co.uk/wp-content/uploads/2023/05/IMG_9676.jpg)
All works were carried out under full CDM obligations.
- Creation of load bearing first and second floor offices using the Met-sec system
- All plumbing works including plumb lines to all areas of the manufacturing site
- Glass and Solid Partitions
- Floor coverings
- Suspended Ceilings
- Office Furniture
- Complete new installation of electrical works and data cabling
- Toilets and Cubicles
- New Staff Kitchen
- Coffee Shop.
- CCTV
- Access Control
- Air Conditioning
- Fire Alarm
- New windows and doors throughout
- Decoration internally and Externally
- Electrical car charging points
![](https://trucontracts.co.uk/wp-content/uploads/2023/05/6-1024x768.jpeg)
![](https://trucontracts.co.uk/wp-content/uploads/2023/05/8f244acd-bf5d-434c-bf14-2901144a2ec8-768x1024.jpg)